|
Transportation
Dallas North Tollway, Phase 3
Frisco, Texas
The Dallas North Tollway (DNT) Phase 3 extension is a 9.62 mile extension of the DNT from Gaylord Parkway in Frisco north to US 380 in Collin County. This new section of the DNT is scheduled to be open to traffic in September 2007. Fugro has an on-site soil, concrete and asphalt laboratory with a full-time group of five field technicians currently on-site.
Fugro Services: Construction Materials Engineering and Testing |